Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
VALLEY VIEW HOME
GLASGOW, MT · 96 certified beds · Last Life Safety survey June 17, 2026
CMS Certification Number 275091 · first certified October 1977
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MT
25 citations — more than 78% of the 61 certified nursing homes in MT. Compared within MT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 14 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens June 2027 — about 9 months from now. This facility’s last Life Safety survey was June 2026. Facilities in MT are typically surveyed 12–13 months after the last one (median 12), measured over 104 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about VALLEY VIEW HOME
One email when it happens. No account; stop it any time with one click.
6 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
5 of the 25 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 25 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in MT, and nationally. Surveyors differ markedly between states, so the MT figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 25 |
| Median facility in MT | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 17, 2024 | 6 |
| June 30, 2025 | 5 |
| June 17, 2026 | 14 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 3 | 2026-06-17 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2026-06-17 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 2 | 2025-06-30 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2026-06-17 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2026-06-17 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2026-06-17 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2025-06-30 |
| E-0015 | Address subsistence needs for staff and patients. | 1 | 2026-06-17 |
What the citations cover
- Smoke Deficiencies 10
- Emergency Preparedness Deficiencies 5
- Egress Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 10 |
| Emergency Preparedness Deficiencies | 5 |
| Egress Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Miscellaneous Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 17, 2026 — 14 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has plan of correction (August 6, 2026) |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has plan of correction (August 6, 2026) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has plan of correction (August 6, 2026) |
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has plan of correction (August 6, 2026) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has plan of correction (August 6, 2026) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has plan of correction (August 6, 2026) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has plan of correction (August 6, 2026) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has plan of correction (August 6, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has plan of correction (August 6, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has plan of correction (August 6, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has plan of correction (August 6, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has plan of correction (August 6, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has plan of correction (August 6, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has plan of correction (August 6, 2026) |
June 30, 2025 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (July 29, 2025) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (July 29, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (July 29, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (July 29, 2025) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (July 29, 2025) |
July 17, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (August 7, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (August 7, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 12, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (August 7, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (August 7, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 7, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.