Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Alamance Health Care Center

Burlington, NC · 180 certified beds · Last Life Safety survey May 4, 2026

CMS Certification Number 345420 · first certified April 1992

Ownership

Operated by LIFEWORKS REHAB · For profit - Corporation

  • Ownership changed May 28, 2021 (change of ownership)from BURLINGTON HEALTH CARE CENTER 66, INC.
16
Citations on file
CMS's current file
3
Life Safety surveys
CMS's current file
3
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within NC

16 citations — more than 79% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in CMS's current file.

The latest survey found 2 citations; the earlier surveys on file averaged 7. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens June 2027 — about 7 months from now. This facility’s last Life Safety survey was May 2026. Facilities in NC are typically surveyed 14–15 months after the last one (median 14), measured over 458 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about Alamance Health Care Center

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 16 Life Safety citations above. The Physical Environment Index

  • F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations in CMS's current file

Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.

This facility16NC median10National median11
Citations in CMS's current file, compared
MeasureCitations
This facility16
Median facility in NC10
Median facility nationally11

Survey history

Citations at each Life Safety survey
42024-04102025-0522026-05
Citations at each Life Safety survey
Survey dateCitations
April 23, 20244
May 1, 202510
May 4, 20262

Most-cited tags

Most-cited tags at this facility
K-09192K-03212K-02112K-03631K-01611K-09231K-03241K-02711
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0919Meet requirements for the use of electrical equipment.22025-05-01
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22025-05-01
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22026-05-04
K-0363Install corridor and hallway doors that block smoke.12025-05-01
K-0161Use approved construction type or materials.12025-05-01
K-0923Have proper medical gas storage and administration areas.12024-04-23
K-0324Provide properly protected cooking facilities.12025-05-01
K-0271Have exits that are accessible at all times.12025-05-01

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 7
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Egress Deficiencies 3
  • Services Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies7
Gas, Vacuum, and Electrical Systems Deficiencies4
Egress Deficiencies3
Services Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 4, 2026 — 2 citations

Citations issued on May 4, 2026
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (September 12, 2026)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (September 12, 2026)

May 1, 2025 — 10 citations

Citations issued on May 1, 2025
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (July 4, 2025)
K-0271Have exits that are accessible at all times.Deficient, Provider has date of correction (July 4, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (July 4, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (July 4, 2025)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (July 4, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (July 4, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (July 4, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (July 4, 2025)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (July 4, 2025)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (July 4, 2025)

April 23, 2024 — 4 citations

Citations issued on April 23, 2024
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (May 25, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 25, 2024)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (May 25, 2024)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (May 25, 2024)

Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.