Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PruittHealth-Farmville
Farmville, NC · 56 certified beds · Last Life Safety survey August 8, 2024
CMS Certification Number 345384 · first certified July 1991
Ownership
Operated by PRUITTHEALTH · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NC
12 citations — more than 60% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (October 2025 to December 2025), and past the point by which nine in ten NC facilities have been surveyed. This facility’s last Life Safety survey was August 2024. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PruittHealth-Farmville
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 12 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 12 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 27, 2022 | 0 |
| May 11, 2023 | 8 |
| August 8, 2024 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2024-08-08 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2023-05-11 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 1 | 2024-08-08 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2023-05-11 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2023-05-11 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2023-05-11 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2024-08-08 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2023-05-11 |
What the citations cover
- Smoke Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 2
- Miscellaneous Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 8, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (September 21, 2024) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (September 21, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (September 21, 2024) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (September 21, 2024) |
May 11, 2023 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (September 3, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 3, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (September 3, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 3, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (September 3, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (September 3, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 3, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (September 3, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.