Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
The Greens at Gastonia
Gastonia, NC · 162 certified beds · Last Life Safety survey May 5, 2025
CMS Certification Number 345169 · first certified September 1977
Ownership
Operated by CCH HEALTHCARE · For profit - Corporation
- Ownership changed July 1, 2022 (change of ownership)from SSC GASTONIA OPERATING COMPANY LLC
Position within NC
14 citations — more than 71% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (June 2026 to August 2026), and past the point by which nine in ten NC facilities have been surveyed. This facility’s last Life Safety survey was May 2025. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about The Greens at Gastonia
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
9 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 14 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 3, 2022 | 5 |
| February 1, 2024 | 6 |
| May 5, 2025 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2024-02-01 |
| K-0161 | Use approved construction type or materials. | 2 | 2024-02-01 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-05-05 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2024-02-01 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-02-01 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2024-02-01 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2022-10-03 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2022-10-03 |
What the citations cover
- Smoke Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Services Deficiencies 3
- Construction Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Services Deficiencies | 3 |
| Construction Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 5, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (June 24, 2025) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (June 24, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 24, 2025) |
February 1, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (April 12, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 12, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (April 12, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 12, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (April 12, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (April 12, 2024) |
October 3, 2022 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (January 9, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (January 9, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (January 9, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (January 9, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (January 9, 2023) |