Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Valley Hill Health & Rehab Center
Hendersonville, NC · 150 certified beds · Last Life Safety survey April 10, 2024
CMS Certification Number 345223 · first certified June 1982
Ownership
Operated by SABER HEALTHCARE GROUP · For profit - Corporation
- Ownership changed November 1, 2022 (change of ownership)to VALLEY HILL HEALTH & REHAB CENTER, LLC from HEBRON OPERATING COMPANY LLC
Position within NC
30 citations — more than 98% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 10 citations; the earlier surveys in the window averaged 10. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (June 2025 to August 2025), and past the point by which nine in ten NC facilities have been surveyed. This facility’s last Life Safety survey was April 2024. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Valley Hill Health & Rehab Center
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 30 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 30 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 1, 2021 | 2 |
| January 20, 2023 | 18 |
| April 10, 2024 | 10 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 3 | 2024-04-10 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 3 | 2024-04-10 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2024-04-10 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 2 | 2024-04-10 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 2 | 2024-04-10 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2024-04-10 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-04-10 |
| K-0161 | Use approved construction type or materials. | 1 | 2023-01-20 |
What the citations cover
- Smoke Deficiencies 11
- Egress Deficiencies 8
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Services Deficiencies 2
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 11 |
| Egress Deficiencies | 8 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Services Deficiencies | 2 |
| Miscellaneous Deficiencies | 2 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 10, 2024 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (July 31, 2024) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (July 31, 2024) |
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (July 31, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (July 31, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 31, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (July 31, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (July 31, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (July 31, 2024) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (July 31, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 31, 2024) |
January 20, 2023 — 18 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0352 | Properly install and monitor supervisory attachments on automatic sprinkler systems. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 18, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (May 18, 2023) |
July 1, 2021 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (August 6, 2021) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (August 6, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.