Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Siler City Center
Siler City, NC · 150 certified beds · Last Life Safety survey March 13, 2026
CMS Certification Number 345143 · first certified January 1980
Ownership
Operated by GENESIS HEALTHCARE · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NC
8 citations — more than 32% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys on file averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens May 2027 — about 6 months from now. This facility’s last Life Safety survey was March 2026. Facilities in NC are typically surveyed 14–15 months after the last one (median 14), measured over 458 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about Siler City Center
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 8 |
| Median facility in NC | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 2, 2023 | 3 |
| November 7, 2024 | 3 |
| March 13, 2026 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2024-11-07 |
| K-0161 | Use approved construction type or materials. | 2 | 2026-03-13 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2024-11-07 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2026-03-13 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2023-08-02 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2024-11-07 |
What the citations cover
- Smoke Deficiencies 4
- Construction Deficiencies 2
- Egress Deficiencies 1
- Services Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Construction Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 13, 2026 — 2 citations
November 7, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (January 2, 2025) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (January 2, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (January 2, 2025) |
August 2, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (October 20, 2023) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (October 20, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 20, 2023) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.