Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Warsaw Rehabilitation and Healthcare Center
Warsaw, NC · 100 certified beds · Last Life Safety survey June 22, 2026
CMS Certification Number 345252 · first certified October 1986
Ownership
Operated by YAD HEALTHCARE · For profit - Corporation
- New ownershipOwnership changed July 1, 2025 (change of ownership)from RBM OPCO OF WARSAW LLC
Position within NC
11 citations — more than 53% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys on file averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens August 2027 — about 9 months from now. This facility’s last Life Safety survey was June 2026. Facilities in NC are typically surveyed 14–15 months after the last one (median 14), measured over 458 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about Warsaw Rehabilitation and Healthcare Center
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in NC | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 22, 2024 | 2 |
| March 21, 2025 | 2 |
| June 22, 2026 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2026-06-22 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2025-03-21 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2026-06-22 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2026-06-22 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2026-06-22 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2026-06-22 |
| K-0161 | Use approved construction type or materials. | 1 | 2024-04-22 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-03-21 |
What the citations cover
- Smoke Deficiencies 6
- Egress Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Construction Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Egress Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Construction Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 22, 2026 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has plan of correction (September 25, 2026) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has plan of correction (September 25, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has plan of correction (September 25, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has plan of correction (September 25, 2026) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has plan of correction (September 25, 2026) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has plan of correction (September 25, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has plan of correction (September 25, 2026) |
March 21, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 2, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 2, 2025) |
April 22, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (July 5, 2024) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (July 5, 2024) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.