Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Adept Nursing & Rehab of Blue Hill

BLUE HILL, NE · 62 certified beds · Last Life Safety survey April 17, 2025

CMS Certification Number 285144 · first certified June 1994

Ownership

Operated by AVID HEALTHCARE GROUP · For profit - Limited Liability company

  • Ownership changed August 2, 2023 (change of ownership)to THE PINES AT BLUE HILL from BCP BLUE HILL LLC
25
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
5
Tags cited more than once
Across separate surveys
11
Inspection & testing records
Of the citations on file

Position within NE

25 citations — more than 80% of the 180 certified nursing homes in NE. Compared within NE rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 12 citations; the earlier surveys in the window averaged 6.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (April 2026 to June 2026), and past the point by which nine in ten NE facilities have been surveyed. This facility’s last Life Safety survey was April 2025. Facilities in NE are typically surveyed 12–14 months after the last one (median 13), measured over 271 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Adept Nursing & Rehab of Blue Hill

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

4 of the 25 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

7 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 25 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0923 Have enough outside ventilation via a window or mechanical ventilation, or both.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in NE, and nationally. Surveyors differ markedly between states, so the NE figure is the meaningful one.

This facility25NE median15National median11
Citations on file over three years, compared
MeasureCitations
This facility25
Median facility in NE15
Median facility nationally11

Survey history

Citations at each Life Safety survey
72023-0562024-05122025-04
Citations at each Life Safety survey
Survey dateCitations
May 3, 20237
May 23, 20246
April 17, 202512

Most-cited tags

Most-cited tags at this facility
K-09183E-00413K-03532K-09212K-03452K-07611K-07121K-03211
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.32025-04-17
E-0041Implement emergency and standby power systems.32025-04-17
K-0353Inspect, test, and maintain automatic sprinkler systems.22025-04-17
K-0921Ensure that testing and maintenance of electrical equipment is performed.22025-04-17
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22025-04-17
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.12025-04-17
K-0712Have simulated fire drills held at unexpected times.12023-05-03
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12024-05-23

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 7
  • Smoke Deficiencies 6
  • Miscellaneous Deficiencies 4
  • Egress Deficiencies 4
  • Other 4
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies7
Smoke Deficiencies6
Miscellaneous Deficiencies4
Egress Deficiencies4
Emergency Preparedness Deficiencies4

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 17, 2025 — 12 citations

Citations issued on April 17, 2025
TagWhat the surveyor checksStatus
E-0032Provide primary/alternate means for communication.Deficient, Provider has date of correction (May 30, 2025)
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (June 1, 2025)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (June 1, 2025)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (June 1, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (June 1, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 1, 2025)
K-0700Meet requirements for operating features, such as evacuation plans, fire drills, smoking regulations, draperies, decorations and the inspection, testing and maintenance of fire doors.Deficient, Provider has date of correction (June 1, 2025)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (June 1, 2025)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (June 1, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (June 1, 2025)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (June 1, 2025)
K-0922Meet requirements for the use and maintenance of medical gas equipment.Deficient, Provider has date of correction (June 1, 2025)

May 23, 2024 — 6 citations

Citations issued on May 23, 2024
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (July 6, 2024)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (July 6, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (July 6, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (July 6, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (July 6, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (July 6, 2024)

May 3, 2023 — 7 citations

Citations issued on May 3, 2023
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (June 10, 2023)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (June 10, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (June 10, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (June 10, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (June 10, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (June 10, 2023)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (June 10, 2023)