Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Jefferson Community Health & Life Gardenside
Fairbury, NE · 39 certified beds · Last Life Safety survey April 8, 2026
CMS Certification Number 285282 · first certified October 2009
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NE
17 citations — more than 56% of the 180 certified nursing homes in NE. Compared within NE rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 11 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens April 2027 — about 6 months from now. This facility’s last Life Safety survey was April 2026. Facilities in NE are typically surveyed 12–14 months after the last one (median 13), measured over 271 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Jefferson Community Health & Life Gardenside
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NE, and nationally. Surveyors differ markedly between states, so the NE figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 17 |
| Median facility in NE | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 21, 2023 | 3 |
| November 13, 2024 | 3 |
| April 8, 2026 | 11 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 2 | 2026-04-08 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 2 | 2026-04-08 |
| K-0132 | Meet requirements for outpatient facilities located next to inpatient facilities separated by fire resistive construction. | 2 | 2026-04-08 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2026-04-08 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2026-04-08 |
| K-0200 | Meet other general requirements. | 1 | 2024-11-13 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2026-04-08 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2023-12-21 |
What the citations cover
- Egress Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Construction Deficiencies 3
- Smoke Deficiencies 2
- Other 2
| Category | Citations |
|---|---|
| Egress Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Construction Deficiencies | 3 |
| Smoke Deficiencies | 2 |
| Miscellaneous Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 8, 2026 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0132 | Meet requirements for outpatient facilities located next to inpatient facilities separated by fire resistive construction. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (May 1, 2026) |
November 13, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0200 | Meet other general requirements. | Deficient, Provider has date of correction (December 28, 2024) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (December 28, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (December 28, 2024) |
December 21, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0131 | Meet requirements for sections of health care facilities separated by fire resistive construction. | Deficient, Provider has date of correction (January 5, 2024) |
| K-0132 | Meet requirements for outpatient facilities located next to inpatient facilities separated by fire resistive construction. | Waiver has been granted (February 20, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (January 4, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.