Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
LITTLE BROOK NURSING AND CONVALESCENT HOME
CALIFON, NJ · 36 certified beds · Last Life Safety survey October 30, 2024
CMS Certification Number 315467 · first certified February 2001
Ownership
Independently operated (no chain recorded by CMS) · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NJ
40 citations — more than 99% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 15 citations; the earlier surveys in the window averaged 12.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Past the typical window (February 2026 to July 2026). Most NJ facilities have been surveyed by December 2026. This facility’s last Life Safety survey was October 2024. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about LITTLE BROOK NURSING AND CONVALESCENT HOME
One email when it happens. No account; stop it any time with one click.
5 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
7 of the 40 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 40 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 40 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 21, 2021 | 11 |
| June 15, 2023 | 14 |
| October 30, 2024 | 15 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 3 | 2024-10-30 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2024-10-30 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2024-10-30 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 2 | 2024-10-30 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2023-06-15 |
| K-0252 | Provide at least two remote exits on each floor or fire section of the building. | 2 | 2023-06-15 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2024-10-30 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 1 | 2023-06-15 |
What the citations cover
- Smoke Deficiencies 12
- Egress Deficiencies 9
- Emergency Preparedness Deficiencies 7
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Other 6
| Category | Citations |
|---|---|
| Smoke Deficiencies | 12 |
| Egress Deficiencies | 9 |
| Emergency Preparedness Deficiencies | 7 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Miscellaneous Deficiencies | 4 |
| Services Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
October 30, 2024 — 15 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (November 22, 2024) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (November 22, 2024) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (November 22, 2024) |
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (November 22, 2024) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (November 27, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (November 22, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (November 22, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 22, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (November 25, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (November 25, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (November 25, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (November 25, 2024) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (November 25, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 27, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (November 25, 2024) |
June 15, 2023 — 14 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (July 26, 2023) |
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (July 26, 2023) |
| E-0025 | Create arrangements with other facilities to receive patients. | Deficient, Provider has date of correction (July 26, 2023) |
| E-0031 | Provide emergency officials' contact information. | Deficient, Provider has date of correction (July 26, 2023) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (July 26, 2023) |
| K-0252 | Provide at least two remote exits on each floor or fire section of the building. | Waiver has been granted (August 21, 2023) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (July 25, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (July 25, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (July 25, 2023) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (August 21, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 17, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (July 25, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (August 16, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 27, 2023) |
May 21, 2021 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (June 9, 2021) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (June 1, 2021) |
| K-0252 | Provide at least two remote exits on each floor or fire section of the building. | Waiver has been granted (September 28, 2021) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (May 31, 2021) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Waiver has been granted (November 15, 2021) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 10, 2021) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (June 12, 2021) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (June 1, 2021) |
| K-0781 | Have restrictions on the use of portable space heaters. | Deficient, Provider has date of correction (June 7, 2021) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 6, 2021) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (May 24, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.