Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CAREONE AT CRESSKILL
CRESSKILL, NJ · 113 certified beds · Last Life Safety survey March 19, 2026
CMS Certification Number 315313 · first certified May 1992
Ownership
Operated by CAREONE · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NJ
9 citations — more than 18% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens July 2027 — about 9 months from now. This facility’s last Life Safety survey was March 2026. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CAREONE AT CRESSKILL
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 21, 2023 | 4 |
| October 29, 2024 | 3 |
| March 19, 2026 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2023-07-21 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2023-07-21 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2023-07-21 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-10-29 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2024-10-29 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-10-29 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2026-03-19 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2026-03-19 |
What the citations cover
- Smoke Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Miscellaneous Deficiencies 1
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 19, 2026 — 2 citations
October 29, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (November 1, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (October 30, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (November 26, 2024) |
July 21, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (August 31, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 11, 2023) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (August 18, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 8, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.