Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Complete Care at Bayshore LLC

HOLMDEL, NJ · 232 certified beds · Last Life Safety survey October 30, 2024

CMS Certification Number 315252 · first certified January 1988

Ownership

Operated by COMPLETE CARE · For profit - Corporation

  • Ownership changed March 16, 2023 (change of ownership)from HACKENSACK MERIDIAN AMBULATORY CARE, INC.
14
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
3
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within NJ

14 citations — more than 44% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Past the typical window (February 2026 to July 2026). Most NJ facilities have been surveyed by December 2026. This facility’s last Life Safety survey was October 2024. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Complete Care at Bayshore LLC

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.

This facility14NJ median15National median11
Citations on file over three years, compared
MeasureCitations
This facility14
Median facility in NJ15
Median facility nationally11

Survey history

Citations at each Life Safety survey
92022-0832023-1022024-10
Citations at each Life Safety survey
Survey dateCitations
August 3, 20229
October 19, 20233
October 30, 20242

Most-cited tags

Most-cited tags at this facility
K-03113K-03722K-09142K-02911K-09181K-03211K-03551K-03411
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0311Have an enclosure around a vertical opening shaft.32024-10-30
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.22023-10-19
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.22024-10-30
K-0291Install emergency lighting that can last at least 1 1/2 hours.12022-08-03
K-0918Have generator or other power source capable of supplying service within 10 seconds.12022-08-03
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12022-08-03
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12022-08-03
K-0341Install a fire alarm system that can be heard throughout the facility.12022-08-03

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 10
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Egress Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies10
Gas, Vacuum, and Electrical Systems Deficiencies3
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

October 30, 2024 — 2 citations

Citations issued on October 30, 2024
TagWhat the surveyor checksStatus
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (November 12, 2024)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (November 12, 2024)

October 19, 2023 — 3 citations

Citations issued on October 19, 2023
TagWhat the surveyor checksStatus
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (November 1, 2023)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (November 1, 2023)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (November 1, 2023)

August 3, 2022 — 9 citations

Citations issued on August 3, 2022
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (October 4, 2022)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (September 13, 2022)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (September 13, 2022)
K-0341Install a fire alarm system that can be heard throughout the facility.Waiver has been granted (October 12, 2022)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (October 12, 2022)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (September 13, 2022)
K-0364Install properly constructed windows in hallway walls or doors.Deficient, Provider has date of correction (September 13, 2022)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (September 13, 2022)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (October 12, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.