Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CLOVER MEADOWS HEALTHCARE AND REHABILITATION CENTE
LAWRENCEVILLE, NJ · 100 certified beds · Last Life Safety survey January 16, 2025
CMS Certification Number 315113 · first certified February 1970
Ownership
Operated by MB HEALTHCARE · For profit - Limited Liability company
- Ownership changed June 1, 2019 (change of ownership)to CLIPBOARD HEALTH from 112 FRANKLIN CORNER ROAD OPERATING COMPANY LLC
Position within NJ
13 citations — more than 38% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 6 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Past the typical window (May 2026 to September 2026). Most NJ facilities have been surveyed by February 2027. This facility’s last Life Safety survey was January 2025. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CLOVER MEADOWS HEALTHCARE AND REHABILITATION CENTE
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 13 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 13 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 27, 2021 | 2 |
| October 31, 2023 | 5 |
| January 16, 2025 | 6 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2025-01-16 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2025-01-16 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-01-16 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2025-01-16 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2025-01-16 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2023-10-31 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2021-08-27 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-10-31 |
What the citations cover
- Smoke Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 3
- Services Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 3 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 16, 2025 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (February 4, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (February 4, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 7, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (February 4, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (February 4, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (February 4, 2025) |
October 31, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (December 13, 2023) |
August 27, 2021 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (October 10, 2021) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (October 10, 2021) |