Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
COMPLETE CARE AT MONMOUTH, LLC
LONG BRANCH, NJ · 120 certified beds · Last Life Safety survey December 12, 2024
CMS Certification Number 315284 · first certified July 1989
Ownership
Operated by COMPLETE CARE · For profit - Limited Liability company
- Ownership changed December 27, 2021 (change of ownership)from 229 BATH AVENUE INC
Position within NJ
11 citations — more than 27% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Past the typical window (April 2026 to August 2026). Most NJ facilities have been surveyed by January 2027. This facility’s last Life Safety survey was December 2024. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about COMPLETE CARE AT MONMOUTH, LLC
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 19, 2021 | 4 |
| November 16, 2023 | 3 |
| December 12, 2024 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | 1 | 2021-07-19 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2023-11-16 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2024-12-12 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2021-07-19 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2021-07-19 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2021-07-19 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-12-12 |
| K-0281 | Install proper backup exit lighting. | 1 | 2024-12-12 |
What the citations cover
- Smoke Deficiencies 6
- Egress Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Egress Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 12, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (January 17, 2025) |
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (January 17, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 17, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (January 17, 2025) |
November 16, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (December 31, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (December 31, 2023) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (December 31, 2023) |
July 19, 2021 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 7, 2021) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (September 7, 2021) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (September 7, 2021) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (September 7, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.