Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
EXCEL CARE AT MANALAPAN
MANALAPAN, NJ · 132 certified beds · Last Life Safety survey August 13, 2025
CMS Certification Number 315282 · first certified July 1989
Ownership
Operated by ACCELA HEALTHCARE · For profit - Limited Liability company
- Ownership changed December 27, 2021 (change of ownership)to ACCELA REHAB AND CARE CENTER AT MANALAPAN from PINEBROOK CARE CENTER INC
Position within NJ
27 citations — more than 89% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 9 citations; the earlier surveys in the window averaged 9. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2026 — about 2 months from now. This facility’s last Life Safety survey was August 2025. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about EXCEL CARE AT MANALAPAN
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
8 of the 27 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 27 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 27 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 23, 2021 | 4 |
| March 6, 2024 | 14 |
| August 13, 2025 | 9 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 2 | 2025-08-13 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-08-13 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2025-08-13 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 2 | 2024-03-06 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 2 | 2024-03-06 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2025-08-13 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2024-03-06 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2024-03-06 |
What the citations cover
- Emergency Preparedness Deficiencies 8
- Egress Deficiencies 7
- Smoke Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Other 3
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 8 |
| Egress Deficiencies | 7 |
| Smoke Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Services Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 13, 2025 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0252 | Provide at least two remote exits on each floor or fire section of the building. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0300 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 13, 2025) |
March 6, 2024 — 14 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0001 | Establish an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (April 16, 2024) |
| E-0007 | Address patient/client population and determine types of services needed. | Deficient, Provider has date of correction (April 16, 2024) |
| E-0018 | Establish procedures for tracking staff and patients during an emergency. | Deficient, Provider has date of correction (April 16, 2024) |
| E-0025 | Create arrangements with other facilities to receive patients. | Deficient, Provider has date of correction (April 16, 2024) |
| E-0031 | Provide emergency officials' contact information. | Deficient, Provider has date of correction (April 16, 2024) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (April 16, 2024) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (April 16, 2024) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (April 16, 2024) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (April 16, 2024) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (April 16, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 16, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 16, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (April 16, 2024) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (April 16, 2024) |
November 23, 2021 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (December 2, 2021) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (November 26, 2021) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 14, 2021) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (December 31, 2021) |