Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
TOTAL REHAB MOORESTOWN
MOORESTOWN, NJ · 124 certified beds · Last Life Safety survey April 17, 2025
CMS Certification Number 315517 · first certified November 2014
Ownership
Operated by PREFERRED CARE · For profit - Limited Liability company
- Ownership changed January 8, 2024 (change of ownership)from PROMEDICA SENIOR CARE OF MOORESTOWN NJ LLC
Position within NJ
10 citations — more than 23% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: August 2026 to December 2026. This facility’s last Life Safety survey was April 2025. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about TOTAL REHAB MOORESTOWN
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
1 of the 10 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 10 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 23, 2021 | 1 |
| December 8, 2023 | 6 |
| April 17, 2025 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2025-04-17 |
| K-0912 | Have power receptacles that are properly grounded. | 1 | 2023-12-08 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2021-08-23 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2023-12-08 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-12-08 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2023-12-08 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2025-04-17 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 1 | 2025-04-17 |
What the citations cover
- Smoke Deficiencies 5
- Egress Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Emergency Preparedness Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Egress Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 17, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (May 13, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 13, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (May 13, 2025) |
December 8, 2023 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (January 22, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (January 22, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (January 22, 2024) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (January 22, 2024) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (January 22, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (January 22, 2024) |
August 23, 2021 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (September 17, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.