Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
ROSE MOUNTAIN CARE CENTER
NEW BRUNSWICK, NJ · 112 certified beds · Last Life Safety survey May 29, 2026
CMS Certification Number 315384 · first certified December 1997
Ownership
Operated by THE ROSENBERG FAMILY · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NJ
22 citations — more than 80% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 10. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens September 2027 — about 12 months from now. This facility’s last Life Safety survey was May 2026. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about ROSE MOUNTAIN CARE CENTER
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
7 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 22 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 22 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 28, 2023 | 6 |
| December 12, 2024 | 14 |
| May 29, 2026 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 3 | 2026-05-29 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 2 | 2024-12-12 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2024-12-12 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2023-09-28 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-12-12 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2024-12-12 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2024-12-12 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2026-05-29 |
What the citations cover
- Smoke Deficiencies 11
- Egress Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 11 |
| Egress Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 29, 2026 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 10, 2026) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (June 10, 2026) |
December 12, 2024 — 14 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (December 25, 2024) |
September 28, 2023 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (October 12, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (November 17, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 12, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (October 12, 2023) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (October 12, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (October 12, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.