Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

CAREONE AT RIDGEWOOD AVENUE

PARAMUS, NJ · 110 certified beds · Last Life Safety survey June 4, 2025

CMS Certification Number 315426 · first certified May 1998

Ownership

Operated by CAREONE · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

14
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
4
Inspection & testing records
Of the citations on file

Position within NJ

14 citations — more than 44% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 9 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: September 2026 to February 2027. This facility’s last Life Safety survey was June 2025. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about CAREONE AT RIDGEWOOD AVENUE

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.

This facility14NJ median15National median11
Citations on file over three years, compared
MeasureCitations
This facility14
Median facility in NJ15
Median facility nationally11

Survey history

Citations at each Life Safety survey
12021-0642023-0992025-06
Citations at each Life Safety survey
Survey dateCitations
June 30, 20211
September 28, 20234
June 4, 20259

Most-cited tags

Most-cited tags at this facility
K-03412K-03241K-05311K-03471K-02251K-09181K-03511K-03211
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0341Install a fire alarm system that can be heard throughout the facility.22025-06-04
K-0324Provide properly protected cooking facilities.12023-09-28
K-0531Have elevators that firefighters can control in the event of a fire.12025-06-04
K-0347Properly provide smoke detection systems in areas open to corridors.12025-06-04
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.12025-06-04
K-0918Have generator or other power source capable of supplying service within 10 seconds.12025-06-04
K-0351Install an approved automatic sprinkler system.12025-06-04
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12025-06-04

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 8
  • Egress Deficiencies 3
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Services Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies8
Egress Deficiencies3
Gas, Vacuum, and Electrical Systems Deficiencies2
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

June 4, 2025 — 9 citations

Citations issued on June 4, 2025
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (July 20, 2025)
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.Deficient, Provider has date of correction (July 20, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (July 20, 2025)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (July 20, 2025)
K-0347Properly provide smoke detection systems in areas open to corridors.Deficient, Provider has date of correction (July 20, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (July 20, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (July 20, 2025)
K-0531Have elevators that firefighters can control in the event of a fire.Deficient, Provider has date of correction (July 20, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (July 20, 2025)

September 28, 2023 — 4 citations

Citations issued on September 28, 2023
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (October 11, 2023)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (October 16, 2023)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (October 16, 2023)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (October 16, 2023)

June 30, 2021 — 1 citation

Citations issued on June 30, 2021
TagWhat the surveyor checksStatus
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (July 28, 2021)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.