Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

RIVERVIEW ESTATES REHAB AND SENIOR LIVING CENTER

RIVERTON, NJ · 66 certified beds · Last Life Safety survey January 7, 2026

CMS Certification Number 315448 · first certified March 1998

Ownership

Operated by ALLAIRE HEALTH SERVICES · For profit - Limited Liability company

  • Ownership changed June 1, 2022 (change of ownership)to RIVERVIEW ESTATES REHABILITATION AND SENIOR LIVING CENTER from BAPTIST HOME OF SOUTH JERSEY, INC
10
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within NJ

10 citations — more than 23% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens April 2027 — about 7 months from now. This facility’s last Life Safety survey was January 2026. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about RIVERVIEW ESTATES REHAB AND SENIOR LIVING CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.

This facility10NJ median15National median11
Citations on file over three years, compared
MeasureCitations
This facility10
Median facility in NJ15
Median facility nationally11

Survey history

Citations at each Life Safety survey
62023-1022024-0922026-01
Citations at each Life Safety survey
Survey dateCitations
October 30, 20236
September 6, 20242
January 7, 20262

Most-cited tags

Most-cited tags at this facility
K-03722K-03551K-03411K-02931K-03641K-03531K-03631K-03211
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.22026-01-07
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12026-01-07
K-0341Install a fire alarm system that can be heard throughout the facility.12023-10-30
K-0293Have properly located and lighted "Exit" signs.12023-10-30
K-0364Install properly constructed windows in hallway walls or doors.12023-10-30
K-0353Inspect, test, and maintain automatic sprinkler systems.12024-09-06
K-0363Install corridor and hallway doors that block smoke.12024-09-06
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12023-10-30

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 9
  • Egress Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies9
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

January 7, 2026 — 2 citations

Citations issued on January 7, 2026
TagWhat the surveyor checksStatus
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (January 7, 2026)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (January 7, 2026)

September 6, 2024 — 2 citations

Citations issued on September 6, 2024
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (November 1, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (October 15, 2024)

October 30, 2023 — 6 citations

Citations issued on October 30, 2023
TagWhat the surveyor checksStatus
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (December 4, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (December 4, 2023)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (December 4, 2023)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (December 4, 2023)
K-0364Install properly constructed windows in hallway walls or doors.Deficient, Provider has date of correction (December 4, 2023)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (December 4, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.