Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

MERRY HEART NURSING HOME

SUCCASUNNA, NJ · 113 certified beds · Last Life Safety survey January 16, 2025

CMS Certification Number 315057 · first certified January 1967

Ownership

Independently operated (no chain recorded by CMS) · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

11
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within NJ

11 citations — more than 27% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 7 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Past the typical window (May 2026 to September 2026). Most NJ facilities have been surveyed by February 2027. This facility’s last Life Safety survey was January 2025. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about MERRY HEART NURSING HOME

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.

This facility11NJ median15National median11
Citations on file over three years, compared
MeasureCitations
This facility11
Median facility in NJ15
Median facility nationally11

Survey history

Citations at each Life Safety survey
42021-1102024-0172025-01
Citations at each Life Safety survey
Survey dateCitations
November 12, 20214
January 5, 20240
January 16, 20257

Most-cited tags

Most-cited tags at this facility
K-09182K-03211K-03531K-09141K-03511K-03611K-09201K-02911
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.22025-01-16
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12021-11-12
K-0353Inspect, test, and maintain automatic sprinkler systems.12025-01-16
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.12025-01-16
K-0351Install an approved automatic sprinkler system.12025-01-16
K-0361Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected.12025-01-16
K-0920Ensure proper usage of power strips and extension cords.12021-11-12
K-0291Install emergency lighting that can last at least 1 1/2 hours.12021-11-12

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 6
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Egress Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies6
Gas, Vacuum, and Electrical Systems Deficiencies4
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

January 16, 2025 — 7 citations

Citations issued on January 16, 2025
TagWhat the surveyor checksStatus
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (February 20, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (January 31, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (February 6, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (February 6, 2025)
K-0361Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected.Deficient, Provider has date of correction (February 20, 2025)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (January 20, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (February 7, 2025)

November 12, 2021 — 4 citations

Citations issued on November 12, 2021
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (November 13, 2021)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (January 13, 2022)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (November 17, 2021)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (November 13, 2021)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.