Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

ALARIS HEALTH AT WEST ORANGE

WEST ORANGE, NJ · 120 certified beds · Last Life Safety survey May 21, 2026

CMS Certification Number 315449 · first certified September 1998

Ownership

Operated by ALARIS HEALTH · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

17
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
3
Tags cited more than once
Across separate surveys
7
Inspection & testing records
Of the citations on file

Position within NJ

17 citations — more than 59% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 6 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens September 2027 — about 11 months from now. This facility’s last Life Safety survey was May 2026. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about ALARIS HEALTH AT WEST ORANGE

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 17 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.

This facility17NJ median15National median11
Citations on file over three years, compared
MeasureCitations
This facility17
Median facility in NJ15
Median facility nationally11

Survey history

Citations at each Life Safety survey
92022-0822024-1262026-05
Citations at each Life Safety survey
Survey dateCitations
August 12, 20229
December 19, 20242
May 21, 20266

Most-cited tags

Most-cited tags at this facility
K-09182K-03452K-03112K-03721K-02111K-03631K-03211E-00041
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.22026-05-21
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22026-05-21
K-0311Have an enclosure around a vertical opening shaft.22026-05-21
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12026-05-21
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12022-08-12
K-0363Install corridor and hallway doors that block smoke.12022-08-12
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12022-08-12
E-0004Develop and maintain an Emergency Preparedness Program (EP).12026-05-21

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 8
  • Egress Deficiencies 3
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Services Deficiencies 2
  • Other 2
Citations by CMS category
CategoryCitations
Smoke Deficiencies8
Egress Deficiencies3
Gas, Vacuum, and Electrical Systems Deficiencies2
Services Deficiencies2
Emergency Preparedness Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 21, 2026 — 6 citations

Citations issued on May 21, 2026
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (June 12, 2026)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (June 19, 2026)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (June 12, 2026)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (June 12, 2026)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (June 12, 2026)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (June 12, 2026)

December 19, 2024 — 2 citations

Citations issued on December 19, 2024
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (January 21, 2025)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (January 21, 2025)

August 12, 2022 — 9 citations

Citations issued on August 12, 2022
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (September 9, 2022)
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (September 9, 2022)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (September 9, 2022)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (September 29, 2022)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (September 9, 2022)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (September 9, 2022)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (September 9, 2022)
K-0522Have an externally vented heating system.Deficient, Provider has date of correction (September 9, 2022)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (September 9, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.