Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
GROVER C DILS MEDICAL CENTER SNF
CALIENTE, NV · 16 certified beds · Last Life Safety survey March 25, 2026
CMS Certification Number 295026 · first certified September 1974
Ownership
Independently operated (no chain recorded by CMS) · Government - Hospital district
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NV
21 citations — more than 28% of the 66 certified nursing homes in NV. Compared within NV rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 8. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 5 months from now. This facility’s last Life Safety survey was March 2026. Facilities in NV are typically surveyed 11–13 months after the last one (median 12), measured over 117 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about GROVER C DILS MEDICAL CENTER SNF
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
4 of the 21 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 21 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
How that compares
Compared with the median facility in NV, and nationally. Surveyors differ markedly between states, so the NV figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 21 |
| Median facility in NV | 26 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 2, 2024 | 7 |
| April 25, 2025 | 9 |
| March 25, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 2 | 2026-03-25 |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | 2 | 2026-03-25 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2025-04-25 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 2 | 2026-03-25 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-04-25 |
| E-0023 | Establish policies and procedures for medical documentation. | 1 | 2024-05-02 |
| K-0711 | Provide a written emergency evacuation plan. | 1 | 2026-03-25 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2025-04-25 |
What the citations cover
- Smoke Deficiencies 9
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Emergency Preparedness Deficiencies 4
- Services Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Emergency Preparedness Deficiencies | 4 |
| Services Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 25, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (May 28, 2026) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (May 28, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 9, 2026) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (May 28, 2026) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (May 11, 2026) |
April 25, 2025 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (May 15, 2025) |
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has date of correction (May 15, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 15, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 15, 2025) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (May 15, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (May 15, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (May 15, 2025) |
| K-0915 | Have proper power supply for life support equipment. | Deficient, Provider has date of correction (May 15, 2025) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (May 15, 2025) |
May 2, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (May 28, 2024) |
| E-0023 | Establish policies and procedures for medical documentation. | Deficient, Provider has date of correction (May 28, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 28, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 28, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (May 28, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 28, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (May 28, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.