Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
MARQUIS CARE AT CENTENNIAL HILLS
LAS VEGAS, NV · 120 certified beds · Last Life Safety survey June 25, 2026
CMS Certification Number 295089 · first certified November 2010
Ownership
Operated by MARQUIS COMPANIES · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NV
27 citations — more than 55% of the 66 certified nursing homes in NV. Compared within NV rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 6 citations; the earlier surveys on file averaged 10.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens June 2027 — about 7 months from now. This facility’s last Life Safety survey was June 2026. Facilities in NV are typically surveyed 11–13 months after the last one (median 12), measured over 119 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about MARQUIS CARE AT CENTENNIAL HILLS
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
9 of the 27 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 27 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NV, and nationally. Surveyors differ markedly between states, so the NV figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 27 |
| Median facility in NV | 26 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 26, 2024 | 12 |
| June 27, 2025 | 9 |
| June 25, 2026 | 6 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | 3 | 2026-06-25 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2026-06-25 |
| E-0015 | Address subsistence needs for staff and patients. | 3 | 2026-06-25 |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | 2 | 2025-06-27 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-06-27 |
| K-0711 | Provide a written emergency evacuation plan. | 2 | 2026-06-25 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 2 | 2026-06-25 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2025-06-27 |
What the citations cover
- Emergency Preparedness Deficiencies 9
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Smoke Deficiencies 5
- Miscellaneous Deficiencies 4
- Other 4
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 9 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Smoke Deficiencies | 5 |
| Miscellaneous Deficiencies | 4 |
| Services Deficiencies | 3 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 25, 2026 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (August 9, 2026) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (August 9, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (August 9, 2026) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (August 9, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 9, 2026) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (August 9, 2026) |
June 27, 2025 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | No revisit needed (August 11, 2025) |
| E-0009 | Include a process for Emergency Preparedness collaboration. | No revisit needed (August 11, 2025) |
| E-0015 | Address subsistence needs for staff and patients. | No revisit needed (August 11, 2025) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | No revisit needed (August 11, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | No revisit needed (August 11, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | No revisit needed (August 11, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | No revisit needed (August 11, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | No revisit needed (August 11, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | No revisit needed (August 11, 2025) |
July 26, 2024 — 12 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (August 15, 2024) |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (August 15, 2024) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (August 15, 2024) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (August 15, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 15, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 15, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (August 15, 2024) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (August 15, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (August 15, 2024) |
| K-0791 | Ensure that any exit in an area undergoing construction, repair, or improvements shall be inspected daily to ensure its ability to be used instantly in case of emergency. | Deficient, Provider has date of correction (August 15, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 15, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (August 15, 2024) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.