Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
THE HEIGHTS OF SUMMERLIN, LLC
LAS VEGAS, NV · 190 certified beds · Last Life Safety survey March 27, 2026
CMS Certification Number 295083 · first certified March 2005
Ownership
Operated by GENESIS HEALTHCARE · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NV
30 citations — more than 62% of the 66 certified nursing homes in NV. Compared within NV rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 6 citations; the earlier surveys in the window averaged 12. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 5 months from now. This facility’s last Life Safety survey was March 2026. Facilities in NV are typically surveyed 11–13 months after the last one (median 12), measured over 117 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about THE HEIGHTS OF SUMMERLIN, LLC
One email when it happens. No account; stop it any time with one click.
5 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
6 of the 30 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 30 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
How that compares
Compared with the median facility in NV, and nationally. Surveyors differ markedly between states, so the NV figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 30 |
| Median facility in NV | 26 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 1, 2024 | 15 |
| March 18, 2025 | 9 |
| March 27, 2026 | 6 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 3 | 2026-03-27 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 2 | 2025-03-18 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2026-03-27 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2026-03-27 |
| E-0015 | Address subsistence needs for staff and patients. | 2 | 2026-03-27 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 2 | 2025-03-18 |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | 2 | 2025-03-18 |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | 2 | 2025-03-18 |
What the citations cover
- Smoke Deficiencies 10
- Emergency Preparedness Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Miscellaneous Deficiencies 4
- Other 4
| Category | Citations |
|---|---|
| Smoke Deficiencies | 10 |
| Emergency Preparedness Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Miscellaneous Deficiencies | 4 |
| Services Deficiencies | 3 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 27, 2026 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 9, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 9, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 28, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 9, 2026) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (April 23, 2026) |
March 18, 2025 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (April 17, 2025) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (April 17, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 17, 2025) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (April 17, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 17, 2025) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (April 17, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 17, 2025) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (April 17, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (April 17, 2025) |
March 1, 2024 — 15 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (April 22, 2024) |
| E-0020 | Establish policies and procedures including evacuation. | Deficient, Provider has date of correction (April 22, 2024) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (April 22, 2024) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (April 22, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 22, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 22, 2024) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (April 22, 2024) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (April 22, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (April 22, 2024) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (April 22, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (April 22, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (April 22, 2024) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (April 22, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 22, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (April 22, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.