Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
ROSEWOOD REHABILITATION CENTER
RENO, NV · 99 certified beds · Last Life Safety survey December 11, 2025
CMS Certification Number 295020 · first certified June 1970
Ownership
Operated by THE ENSIGN GROUP · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NV
32 citations — more than 65% of the 66 certified nursing homes in NV. Compared within NV rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 12.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2026 — about 2 months from now. This facility’s last Life Safety survey was December 2025. Facilities in NV are typically surveyed 11–13 months after the last one (median 12), measured over 117 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about ROSEWOOD REHABILITATION CENTER
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
12 of the 32 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 32 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NV, and nationally. Surveyors differ markedly between states, so the NV figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 32 |
| Median facility in NV | 26 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 2, 2023 | 17 |
| October 10, 2024 | 8 |
| December 11, 2025 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | 3 | 2025-12-11 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2025-12-11 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 2 | 2024-10-10 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2024-10-10 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2024-10-10 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2024-10-10 |
| E-0023 | Establish policies and procedures for medical documentation. | 1 | 2023-11-02 |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | 1 | 2025-12-11 |
What the citations cover
- Emergency Preparedness Deficiencies 12
- Smoke Deficiencies 10
- Egress Deficiencies 4
- Services Deficiencies 3
- Other 3
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 12 |
| Smoke Deficiencies | 10 |
| Egress Deficiencies | 4 |
| Services Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 11, 2025 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (January 25, 2026) |
| E-0026 | Establish roles under a Waiver declared by secretary. | Deficient, Provider has date of correction (January 25, 2026) |
| E-0035 | Provide family notifications of emergency plan. | Deficient, Provider has date of correction (January 25, 2026) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (January 25, 2026) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (January 25, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 25, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (January 25, 2026) |
October 10, 2024 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (November 11, 2024) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (November 11, 2024) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (November 11, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 11, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (November 11, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (November 11, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 11, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (November 11, 2024) |
November 2, 2023 — 17 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (December 18, 2023) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (December 18, 2023) |
| E-0018 | Establish procedures for tracking staff and patients during an emergency. | Deficient, Provider has date of correction (December 18, 2023) |
| E-0023 | Establish policies and procedures for medical documentation. | Deficient, Provider has date of correction (December 18, 2023) |
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has date of correction (December 18, 2023) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (December 18, 2023) |
| E-0031 | Provide emergency officials' contact information. | Deficient, Provider has date of correction (December 18, 2023) |
| E-0033 | Establish methods for sharing information. | Deficient, Provider has date of correction (December 18, 2023) |
| E-0042 | Meet the requirements of an integrated health system. | Deficient, Provider has date of correction (December 18, 2023) |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Deficient, Provider has date of correction (December 18, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (December 18, 2023) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (December 18, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 18, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 18, 2023) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (December 18, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (December 18, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (December 18, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.