Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Regeis Care Center
Bronx, NY · 236 certified beds · Last Life Safety survey January 21, 2025
CMS Certification Number 335019 · first certified February 1970
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NY
11 citations — more than 34% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: July 2026 to March 2027. This facility’s last Life Safety survey was January 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Regeis Care Center
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 10, 2020 | 2 |
| December 5, 2022 | 2 |
| January 21, 2025 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2025-01-21 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2025-01-21 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2025-01-21 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2020-02-10 |
| K-0281 | Install proper backup exit lighting. | 1 | 2025-01-21 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2025-01-21 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2025-01-21 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2022-12-05 |
What the citations cover
- Smoke Deficiencies 6
- Miscellaneous Deficiencies 2
- Egress Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Miscellaneous Deficiencies | 2 |
| Egress Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 21, 2025 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (February 21, 2025) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (February 21, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (February 21, 2025) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (February 21, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 21, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (February 21, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (February 21, 2025) |
December 5, 2022 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 26, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (January 26, 2023) |
February 10, 2020 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 10, 2020) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (April 10, 2020) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.