Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
The Monarch at Brooklyn Rehabilitation and Nursing
Brooklyn, NY · 200 certified beds · Last Life Safety survey August 14, 2025
CMS Certification Number 335560 · first certified October 1976
Ownership
Operated by CARERITE CENTERS · For profit - Limited Liability company
- Ownership changed July 1, 2021 (change of ownership)to NEW YORK CONGREGATIONAL NURSING CENTER from NEW YORK CONGREGATIONAL NURSING CENTER
Position within NY
20 citations — more than 74% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 8. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens February 2027 — about 4 months from now. This facility’s last Life Safety survey was August 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about The Monarch at Brooklyn Rehabilitation and Nursing
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 20 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 20 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 20 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 3, 2022 | 8 |
| September 15, 2023 | 8 |
| August 14, 2025 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2025-08-14 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 2 | 2023-09-15 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2023-09-15 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-08-14 |
| K-0293 | Have properly located and lighted "Exit" signs. | 2 | 2023-09-15 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2023-09-15 |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | 1 | 2025-08-14 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2023-09-15 |
What the citations cover
- Smoke Deficiencies 11
- Egress Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Emergency Preparedness Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 11 |
| Egress Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 14, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has no plan of correction |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has no plan of correction |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has no plan of correction |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has no plan of correction |
September 15, 2023 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (November 6, 2023) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 15, 2023) |
January 3, 2022 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (March 3, 2022) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (March 3, 2022) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (March 3, 2022) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (March 3, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 3, 2022) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (March 3, 2022) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (March 3, 2022) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (March 3, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.