Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
NOTTINGHAM R H C F
JAMESVILLE, NY · 40 certified beds · Last Life Safety survey September 12, 2025
CMS Certification Number 335800 · first certified October 1996
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NY
11 citations — more than 34% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 5 months from now. This facility’s last Life Safety survey was September 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about NOTTINGHAM R H C F
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 3, 2021 | 2 |
| March 7, 2024 | 6 |
| September 12, 2025 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-03-07 |
| K-0311 | Have an enclosure around a vertical opening shaft. | 1 | 2024-03-07 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2021-12-03 |
| K-0133 | Install a two-hour-resistant firewall separation. | 1 | 2024-03-07 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-09-12 |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | 1 | 2024-03-07 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2025-09-12 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2024-03-07 |
What the citations cover
- Smoke Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Construction Deficiencies 1
- Egress Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Construction Deficiencies | 1 |
| Egress Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 12, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (November 1, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (November 1, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 1, 2025) |
March 7, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0133 | Install a two-hour-resistant firewall separation. | Deficient, Provider has date of correction (May 3, 2024) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (May 3, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 3, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 3, 2024) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (May 3, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 3, 2024) |
December 3, 2021 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (January 31, 2022) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (January 31, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.