Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Greenfield Health & Rehab Center
LANCASTER, NY · 160 certified beds · Last Life Safety survey August 8, 2025
CMS Certification Number 335182 · first certified January 1967
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NY
13 citations — more than 46% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2027 — about 4 months from now. This facility’s last Life Safety survey was August 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Greenfield Health & Rehab Center
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 13 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 13 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 31, 2022 | 0 |
| December 18, 2023 | 9 |
| August 8, 2025 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0754 | Provide properly sized and located linen or trash receptacles. | 2 | 2025-08-08 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 2 | 2025-08-08 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-12-18 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2023-12-18 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2023-12-18 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2025-08-08 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2023-12-18 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2025-08-08 |
What the citations cover
- Smoke Deficiencies 5
- Miscellaneous Deficiencies 3
- Egress Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Miscellaneous Deficiencies | 3 |
| Egress Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 8, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (October 6, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 6, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (October 6, 2025) |
| K-0754 | Provide properly sized and located linen or trash receptacles. | Deficient, Provider has date of correction (September 21, 2025) |
December 18, 2023 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (February 12, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (February 12, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (February 12, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 12, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 12, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (February 12, 2024) |
| K-0754 | Provide properly sized and located linen or trash receptacles. | Deficient, Provider has date of correction (February 12, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 12, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (February 12, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.