Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CROUSE COMMUNITY CENTER INC
MORRISVILLE, NY · 120 certified beds · Last Life Safety survey January 13, 2025
CMS Certification Number 335068 · first certified January 1967
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NY
17 citations — more than 65% of the 593 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 10 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: July 2026 to February 2027. This facility’s last Life Safety survey was January 2025. Facilities in NY are typically surveyed 18–25 months after the last one (median 22), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CROUSE COMMUNITY CENTER INC
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 17 |
| Median facility in NY | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 29, 2021 | 2 |
| March 23, 2023 | 5 |
| January 13, 2025 | 10 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 2 | 2025-01-13 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2023-03-23 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2025-01-13 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2023-03-23 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2025-01-13 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-01-13 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2025-01-13 |
| K-0281 | Install proper backup exit lighting. | 1 | 2023-03-23 |
What the citations cover
- Smoke Deficiencies 9
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Egress Deficiencies 2
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Egress Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 13, 2025 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (February 10, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (February 10, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 10, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 10, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (February 10, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (February 10, 2025) |
| K-0908 | Ensure gas and vacuum systems are inspected and tested as part of a maintenance program. | Deficient, Provider has date of correction (February 28, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 9, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (February 10, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (February 10, 2025) |
March 23, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (April 21, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 21, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 21, 2023) |
| K-0364 | Install properly constructed windows in hallway walls or doors. | Deficient, Provider has date of correction (March 23, 2023) |
| K-0909 | Ensure gas and vacuum piping is labeled. | Deficient, Provider has date of correction (March 23, 2023) |
April 29, 2021 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 29, 2021) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (April 30, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.