Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Epic Rehabilitation And Nursing At White Plains
White Plains, NY · 160 certified beds · Last Life Safety survey May 26, 2026
CMS Certification Number 335878 · first certified April 2020
Ownership
Operated by EPIC HEALTHCARE MANAGEMENT · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NY
19 citations — more than 70% of the 592 certified nursing homes in NY. Compared within NY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys on file averaged 7.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2027 — about 12 months from now. This facility’s last Life Safety survey was May 2026. Facilities in NY are typically surveyed 18–25 months after the last one (median 21), measured over 520 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about Epic Rehabilitation And Nursing At White Plains
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NY, and nationally. Surveyors differ markedly between states, so the NY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 19 |
| Median facility in NY | 14 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 8, 2022 | 9 |
| October 11, 2024 | 6 |
| May 26, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 2 | 2026-05-26 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2026-05-26 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2024-10-11 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2022-03-08 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2024-10-11 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2022-03-08 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2026-05-26 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2022-03-08 |
What the citations cover
- Smoke Deficiencies 9
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Egress Deficiencies 4
- Services Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Egress Deficiencies | 4 |
| Services Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 26, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (July 21, 2026) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (July 21, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (July 21, 2026) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (July 21, 2026) |
October 11, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 2, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 2, 2024) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (December 2, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 2, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (December 2, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (December 2, 2024) |
March 8, 2022 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (May 5, 2022) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (May 5, 2022) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 5, 2022) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (May 5, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 5, 2022) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (May 5, 2022) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (May 5, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 5, 2022) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (May 5, 2022) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.