Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
SUNRISE NURSING HEALTHCARE LLC
AMELIA, OH · 78 certified beds · Last Life Safety survey August 28, 2025
CMS Certification Number 366288 · first certified March 2004
Ownership
Operated by CCH HEALTHCARE · For profit - Corporation
- Ownership changed December 1, 2018 (change of ownership)from SUNRISE MANOR & CONVALESCENT CENTER INC
Position within OH
28 citations — more than 83% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 12.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens April 2027 — about 7 months from now. This facility’s last Life Safety survey was August 2025. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about SUNRISE NURSING HEALTHCARE LLC
One email when it happens. No account; stop it any time with one click.
6 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 28 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 28 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 28 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 11, 2019 | 13 |
| June 9, 2022 | 12 |
| August 28, 2025 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2025-08-28 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 3 | 2025-08-28 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2022-06-09 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 2 | 2022-06-09 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2022-06-09 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 2 | 2022-06-09 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 1 | 2022-06-09 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 1 | 2019-04-11 |
What the citations cover
- Smoke Deficiencies 14
- Miscellaneous Deficiencies 4
- Egress Deficiencies 3
- Services Deficiencies 3
- Other 4
| Category | Citations |
|---|---|
| Smoke Deficiencies | 14 |
| Miscellaneous Deficiencies | 4 |
| Egress Deficiencies | 3 |
| Services Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 28, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (September 15, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (September 15, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 15, 2025) |
June 9, 2022 — 12 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (August 7, 2022) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (August 7, 2022) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (August 7, 2022) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 7, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 7, 2022) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (August 7, 2022) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (August 7, 2022) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (August 7, 2022) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (August 7, 2022) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (August 7, 2022) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (August 7, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 7, 2022) |
April 11, 2019 — 13 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (May 30, 2019) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (May 30, 2019) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (May 30, 2019) |
| K-0344 | Have an alternate power supply for its alarm system. | Deficient, Provider has date of correction (May 30, 2019) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 30, 2019) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (May 30, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 30, 2019) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (May 30, 2019) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (May 30, 2019) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (May 30, 2019) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (May 30, 2019) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 30, 2019) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 30, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.