Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CENTERBURG POINTE
CENTERBURG, OH · 76 certified beds · Last Life Safety survey November 19, 2025
CMS Certification Number 366299 · first certified August 2004
Ownership
Operated by SABER HEALTHCARE GROUP · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within OH
15 citations — more than 44% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 4.7. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens July 2027 — about 9 months from now. This facility’s last Life Safety survey was November 2025. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CENTERBURG POINTE
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
7 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 15 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 15 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 24, 2021 | 6 |
| October 12, 2023 | 6 |
| March 20, 2025 | 2 |
| November 19, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2023-10-12 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2025-11-19 |
| K-0293 | Have properly located and lighted "Exit" signs. | 2 | 2023-10-12 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-10-12 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2023-10-12 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2021-08-24 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2021-08-24 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2021-08-24 |
What the citations cover
- Egress Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Services Deficiencies 3
- Miscellaneous Deficiencies 3
- Other 2
| Category | Citations |
|---|---|
| Egress Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Services Deficiencies | 3 |
| Miscellaneous Deficiencies | 3 |
| Smoke Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
November 19, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (December 30, 2025) |
March 20, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 15, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 15, 2025) |
October 12, 2023 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (December 15, 2023) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (December 15, 2023) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (December 15, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 15, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (December 15, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 15, 2023) |
August 24, 2021 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (September 13, 2021) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 13, 2021) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (September 13, 2021) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (September 13, 2021) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (September 13, 2021) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (September 13, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.