Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

GARDEN PARK HEALTH CARE CENTER

CINCINNATI, OH · 60 certified beds · Last Life Safety survey August 7, 2025

CMS Certification Number 365529 · first certified June 1980

Ownership

Operated by CARECORE HEALTH · For profit - Corporation

  • Ownership changed August 1, 2018 (change of ownership)to GARDEN PARK CARE CENTER from GARDEN PARK CC, INC.
61
Citations on file
Rolling three-year window
5
Life Safety surveys
In the same window
15
Tags cited more than once
Across separate surveys
31
Inspection & testing records
Of the citations on file

Position within OH

61 citations — more than 100% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 12 citations; the earlier surveys in the window averaged 12.3. With 5 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens April 2027 — about 6 months from now. This facility’s last Life Safety survey was August 2025. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about GARDEN PARK HEALTH CARE CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

9 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

4 of the 61 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

15 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 61 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0908 Keep all essential equipment working safely.
  • F-0924 Put firmly secured handrails on each side of hallways.
  • F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
  • F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
  • F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.

How that compares

Citations on file over three years

Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.

This facility61OH median16National median11
Citations on file over three years, compared
MeasureCitations
This facility61
Median facility in OH16
Median facility nationally11

Survey history

Citations at each Life Safety survey
112019-12112022-09102024-07172024-10122025-08
Citations at each Life Safety survey
Survey dateCitations
December 30, 201911
September 21, 202211
July 24, 202410
October 24, 202417
August 7, 202512

Most-cited tags

Most-cited tags at this facility
K-09184K-03534K-03514K-03454K-09203K-05113K-07123K-03633
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.42025-08-07
K-0353Inspect, test, and maintain automatic sprinkler systems.42025-08-07
K-0351Install an approved automatic sprinkler system.42025-08-07
K-0345Have approved installation, maintenance and testing program for fire alarm systems.42025-08-07
K-0920Ensure proper usage of power strips and extension cords.32024-10-24
K-0511Have properly installed electrical wiring and gas equipment.32024-10-24
K-0712Have simulated fire drills held at unexpected times.32025-08-07
K-0363Install corridor and hallway doors that block smoke.32025-08-07

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 26
  • Gas, Vacuum, and Electrical Systems Deficiencies 9
  • Miscellaneous Deficiencies 8
  • Egress Deficiencies 7
  • Other 11
Citations by CMS category
CategoryCitations
Smoke Deficiencies26
Gas, Vacuum, and Electrical Systems Deficiencies9
Miscellaneous Deficiencies8
Egress Deficiencies7
Services Deficiencies5
Emergency Preparedness Deficiencies4
Construction Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

August 7, 2025 — 12 citations

Citations issued on August 7, 2025
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (September 25, 2025)
K-0132Meet requirements for outpatient facilities located next to inpatient facilities separated by fire resistive construction.Deficient, Provider has date of correction (September 25, 2025)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (September 25, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has plan of correction (September 11, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (September 25, 2025)
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.Deficient, Provider has date of correction (September 25, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (September 25, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (September 25, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has no plan of correction
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (September 25, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (September 25, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (September 25, 2025)

October 24, 2024 — 17 citations

Citations issued on October 24, 2024
TagWhat the surveyor checksStatus
E-0006Conduct risk assessment and an All-Hazards approach.Deficient, Provider has date of correction (November 22, 2024)
E-0031Provide emergency officials' contact information.Deficient, Provider has date of correction (November 22, 2024)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (November 22, 2024)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (November 22, 2024)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (November 22, 2024)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (November 22, 2024)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (November 22, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (November 22, 2024)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (November 22, 2024)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (November 22, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (November 22, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (November 22, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (November 22, 2024)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (November 22, 2024)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (November 22, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (November 22, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (November 22, 2024)

July 24, 2024 — 10 citations

Citations issued on July 24, 2024
TagWhat the surveyor checksStatus
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.Deficient, Provider has date of correction (October 24, 2024)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (November 22, 2024)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (October 24, 2024)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (November 22, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (October 24, 2024)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (October 24, 2024)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (November 22, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (November 22, 2024)
K-0912Have power receptacles that are properly grounded.Deficient, Provider has date of correction (October 24, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (November 22, 2024)

September 21, 2022 — 11 citations

Citations issued on September 21, 2022
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (February 2, 2023)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (February 2, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (February 22, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (February 22, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (February 2, 2023)
K-0531Have elevators that firefighters can control in the event of a fire.Deficient, Provider has date of correction (November 23, 2022)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (November 23, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (November 23, 2022)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (February 22, 2023)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (November 23, 2022)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (November 23, 2022)

December 30, 2019 — 11 citations

Citations issued on December 30, 2019
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (March 20, 2020)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (March 20, 2020)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Waiver has been granted (February 7, 2020)
K-0351Install an approved automatic sprinkler system.Waiver has been granted (February 7, 2020)
K-0353Inspect, test, and maintain automatic sprinkler systems.Waiver has been granted (February 7, 2020)
K-0363Install corridor and hallway doors that block smoke.Waiver has been granted (February 7, 2020)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (March 20, 2020)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (March 20, 2020)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (March 20, 2020)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (March 20, 2020)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (March 20, 2020)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.