Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

MT AIRY GARDENS REHABILITATION AND NURSING CENTER

CINCINNATI, OH · 99 certified beds · Last Life Safety survey February 20, 2025

CMS Certification Number 365293 · first certified April 1973

Ownership

Independently operated (no chain recorded by CMS) · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

40
Citations on file
Rolling three-year window
5
Life Safety surveys
In the same window
8
Tags cited more than once
Across separate surveys
14
Inspection & testing records
Of the citations on file

Position within OH

40 citations — more than 96% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 9. With 5 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens October 2026 — about 1 month from now. This facility’s last Life Safety survey was February 2025. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about MT AIRY GARDENS REHABILITATION AND NURSING CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

9 of the 40 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

14 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 40 Life Safety citations above. The Physical Environment Index

  • F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.

How that compares

Citations on file over three years

Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.

This facility40OH median16National median11
Citations on file over three years, compared
MeasureCitations
This facility40
Median facility in OH16
Median facility nationally11

Survey history

Citations at each Life Safety survey
112019-03152021-0572024-0632024-0842025-02
Citations at each Life Safety survey
Survey dateCitations
March 7, 201911
May 11, 202115
June 11, 20247
August 13, 20243
February 20, 20254

Most-cited tags

Most-cited tags at this facility
K-07413K-07123K-09182K-03722K-03452K-03442E-00372E-00042
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.32025-02-20
K-0712Have simulated fire drills held at unexpected times.32024-08-13
K-0918Have generator or other power source capable of supplying service within 10 seconds.22021-05-11
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.22021-05-11
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22025-02-20
K-0344Have an alternate power supply for its alarm system.22025-02-20
E-0037Establish staff and initial training requirements.22024-06-11
E-0004Develop and maintain an Emergency Preparedness Program (EP).22024-06-11

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 14
  • Emergency Preparedness Deficiencies 9
  • Miscellaneous Deficiencies 9
  • Egress Deficiencies 5
  • Other 3
Citations by CMS category
CategoryCitations
Smoke Deficiencies14
Emergency Preparedness Deficiencies9
Miscellaneous Deficiencies9
Egress Deficiencies5
Gas, Vacuum, and Electrical Systems Deficiencies3

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

February 20, 2025 — 4 citations

Citations issued on February 20, 2025
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (March 10, 2025)
K-0344Have an alternate power supply for its alarm system.Deficient, Provider has date of correction (March 10, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (March 10, 2025)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (March 10, 2025)

August 13, 2024 — 3 citations

Citations issued on August 13, 2024
TagWhat the surveyor checksStatus
K-0232Have corridors or aisles that are unobstructed and are at least 8 feet in width.Deficient, Provider has date of correction (August 15, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (August 15, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (August 15, 2024)

June 11, 2024 — 7 citations

Citations issued on June 11, 2024
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (June 14, 2024)
E-0006Conduct risk assessment and an All-Hazards approach.Deficient, Provider has date of correction (June 14, 2024)
E-0029Develop a communication plan.Deficient, Provider has date of correction (June 14, 2024)
E-0030List the names and contact information of those in the facility.Deficient, Provider has date of correction (June 14, 2024)
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (June 14, 2024)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (June 14, 2024)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (June 14, 2024)

May 11, 2021 — 15 citations

Citations issued on May 11, 2021
TagWhat the surveyor checksStatus
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (June 8, 2021)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (June 8, 2021)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (June 8, 2021)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (June 8, 2021)
K-0344Have an alternate power supply for its alarm system.Deficient, Provider has date of correction (June 8, 2021)
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.Deficient, Provider has date of correction (June 8, 2021)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 8, 2021)
K-0354Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours.Deficient, Provider has date of correction (June 8, 2021)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (June 8, 2021)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (June 8, 2021)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (June 8, 2021)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (June 8, 2021)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (June 8, 2021)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (June 8, 2021)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (June 8, 2021)

March 7, 2019 — 11 citations

Citations issued on March 7, 2019
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (April 5, 2019)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (April 5, 2019)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (April 5, 2019)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (April 5, 2019)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (April 5, 2019)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (April 5, 2019)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (April 5, 2019)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (April 5, 2019)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (April 5, 2019)
K-0781Have restrictions on the use of portable space heaters.Deficient, Provider has date of correction (April 5, 2019)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (April 5, 2019)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.