Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
LARCHWOOD CARE
CLEVELAND, OH · 74 certified beds · Last Life Safety survey September 8, 2025
CMS Certification Number 366359 · first certified January 2008
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
- Ownership changed May 1, 2019 (change of ownership)from LARCHWOOD HEALTH GROUP LLC
Position within OH
19 citations — more than 60% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 7.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens May 2027 — about 7 months from now. This facility’s last Life Safety survey was September 2025. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about LARCHWOOD CARE
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
7 of the 19 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
- F-0908 Keep all essential equipment working safely.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 19 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 5, 2019 | 12 |
| November 17, 2022 | 3 |
| September 8, 2025 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-09-08 |
| K-0915 | Have proper power supply for life support equipment. | 2 | 2025-09-08 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-09-08 |
| E-0035 | Provide family notifications of emergency plan. | 1 | 2019-09-05 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2025-09-08 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2019-09-05 |
| E-0024 | Establish policies and procedures for volunteers. | 1 | 2019-09-05 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2022-11-17 |
What the citations cover
- Emergency Preparedness Deficiencies 7
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Smoke Deficiencies 3
- Services Deficiencies 2
- Other 2
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 7 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Smoke Deficiencies | 3 |
| Services Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 8, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 25, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (September 25, 2025) |
| K-0915 | Have proper power supply for life support equipment. | Deficient, Provider has date of correction (September 25, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 25, 2025) |
November 17, 2022 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 6, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (January 6, 2023) |
| K-0915 | Have proper power supply for life support equipment. | Waiver has been granted (January 6, 2023) |
September 5, 2019 — 12 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has plan of correction (November 12, 2019) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has plan of correction (November 12, 2019) |
| E-0018 | Establish procedures for tracking staff and patients during an emergency. | Deficient, Provider has plan of correction (November 12, 2019) |
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has plan of correction (November 12, 2019) |
| E-0026 | Establish roles under a Waiver declared by secretary. | Deficient, Provider has plan of correction (November 12, 2019) |
| E-0034 | Provide a means of sharing information on occupancy/needs. | Deficient, Provider has plan of correction (November 12, 2019) |
| E-0035 | Provide family notifications of emergency plan. | Deficient, Provider has plan of correction (November 12, 2019) |
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (September 30, 2019) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (September 30, 2019) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (September 30, 2019) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 30, 2019) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (September 30, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.