Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

WORTHINGTON CHRISTIAN VILLAGE

COLUMBUS, OH · 40 certified beds · Last Life Safety survey January 27, 2026

CMS Certification Number 365671 · first certified March 1986

Ownership

Independently operated (no chain recorded by CMS) · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

8
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within OH

8 citations — more than 14% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens September 2027 — about 12 months from now. This facility’s last Life Safety survey was January 2026. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about WORTHINGTON CHRISTIAN VILLAGE

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.

How that compares

Citations on file over three years

Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.

This facility8OH median16National median11
Citations on file over three years, compared
MeasureCitations
This facility8
Median facility in OH16
Median facility nationally11

Survey history

Citations at each Life Safety survey
32021-0912024-0342026-01
Citations at each Life Safety survey
Survey dateCitations
September 13, 20213
March 21, 20241
January 27, 20264

Most-cited tags

Most-cited tags at this facility
K-09182K-09201K-03451K-09131K-07121K-02221K-03721
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.22026-01-27
K-0920Ensure proper usage of power strips and extension cords.12026-01-27
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12021-09-13
K-0913Ensure operating rooms are properly protected and written records are maintained and available for inspection.12021-09-13
K-0712Have simulated fire drills held at unexpected times.12026-01-27
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12026-01-27
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12024-03-21

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Smoke Deficiencies 2
  • Egress Deficiencies 1
  • Miscellaneous Deficiencies 1
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies4
Smoke Deficiencies2
Egress Deficiencies1
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

January 27, 2026 — 4 citations

Citations issued on January 27, 2026
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (February 20, 2026)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (February 20, 2026)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (February 20, 2026)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (February 20, 2026)

March 21, 2024 — 1 citation

Citations issued on March 21, 2024
TagWhat the surveyor checksStatus
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (April 17, 2024)

September 13, 2021 — 3 citations

Citations issued on September 13, 2021
TagWhat the surveyor checksStatus
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (September 23, 2021)
K-0913Ensure operating rooms are properly protected and written records are maintained and available for inspection.Deficient, Provider has date of correction (September 23, 2021)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (September 23, 2021)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.