Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

LAURELS OF HUBER HEIGHTS THE

HUBER HEIGHTS, OH · 92 certified beds · Last Life Safety survey August 17, 2023

CMS Certification Number 365627 · first certified July 1984

Ownership

Operated by CIENA HEALTHCARE/LAUREL HEALTH CARE · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

12
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
7
Inspection & testing records
Of the citations on file

Position within OH

12 citations — more than 32% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (April 2025 to April 2026), and past the point by which nine in ten OH facilities have been surveyed. This facility’s last Life Safety survey was August 2023. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about LAURELS OF HUBER HEIGHTS THE

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 12 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.

How that compares

Citations on file over three years

Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.

This facility12OH median16National median11
Citations on file over three years, compared
MeasureCitations
This facility12
Median facility in OH16
Median facility nationally11

Survey history

Citations at each Life Safety survey
42018-1232020-0252023-08
Citations at each Life Safety survey
Survey dateCitations
December 13, 20184
February 6, 20203
August 17, 20235

Most-cited tags

Most-cited tags at this facility
K-03532K-02912K-03411K-07111K-09231K-02221K-03211K-03241
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.22020-02-06
K-0291Install emergency lighting that can last at least 1 1/2 hours.22023-08-17
K-0341Install a fire alarm system that can be heard throughout the facility.12023-08-17
K-0711Provide a written emergency evacuation plan.12018-12-13
K-0923Have proper medical gas storage and administration areas.12023-08-17
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12018-12-13
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12023-08-17
K-0324Provide properly protected cooking facilities.12018-12-13

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 6
  • Egress Deficiencies 3
  • Miscellaneous Deficiencies 2
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies6
Egress Deficiencies3
Miscellaneous Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

August 17, 2023 — 5 citations

Citations issued on August 17, 2023
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (October 6, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (October 6, 2023)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (October 6, 2023)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (October 6, 2023)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (October 6, 2023)

February 6, 2020 — 3 citations

Citations issued on February 6, 2020
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (March 12, 2020)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (March 12, 2020)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (March 12, 2020)

December 13, 2018 — 4 citations

Citations issued on December 13, 2018
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (January 25, 2019)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (January 25, 2019)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 25, 2019)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (January 25, 2019)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.