Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Hill View Skilled Nursing and Rehabilitation Cente
PORTSMOUTH, OH · 72 certified beds · Last Life Safety survey June 10, 2026
CMS Certification Number 365444 · first certified October 1979
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
- New ownershipOwnership changed September 1, 2025 (change of ownership)to HILL VIEW SKILLED NURSING AND REHABILITATION CENTER from HILL VIEW RETIREMENT CENTER
Position within OH
16 citations — more than 49% of the 924 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 6 citations; the earlier surveys on file averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2028 — about 14 months from now. This facility’s last Life Safety survey was June 2026. Facilities in OH are typically surveyed 19–32 months after the last one (median 26), measured over 985 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about Hill View Skilled Nursing and Rehabilitation Cente
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 16 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 16 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 24, 2022 | 5 |
| July 8, 2024 | 5 |
| June 10, 2026 | 6 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2026-06-10 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2026-06-10 |
| K-0912 | Have power receptacles that are properly grounded. | 1 | 2022-06-24 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2026-06-10 |
| K-0541 | Install properly constructed and protected linen or trash chutes. | 1 | 2026-06-10 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2026-06-10 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2024-07-08 |
| K-0131 | Meet requirements for sections of health care facilities separated by fire resistive construction. | 1 | 2022-06-24 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Smoke Deficiencies 4
- Miscellaneous Deficiencies 2
- Egress Deficiencies 2
- Other 2
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Smoke Deficiencies | 4 |
| Miscellaneous Deficiencies | 2 |
| Egress Deficiencies | 2 |
| Services Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 10, 2026 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (July 30, 2026) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (July 30, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (July 30, 2026) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (July 30, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 30, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (July 30, 2026) |
July 8, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (August 27, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 27, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (August 27, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 27, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (August 27, 2024) |
June 24, 2022 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0131 | Meet requirements for sections of health care facilities separated by fire resistive construction. | Deficient, Provider has date of correction (August 13, 2022) |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Deficient, Provider has date of correction (August 13, 2022) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (August 13, 2022) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (August 13, 2022) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (August 13, 2022) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.