Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
NORMANDY MANOR OF ROCKY RIVER
ROCKY RIVER, OH · 150 certified beds · Last Life Safety survey July 11, 2024
CMS Certification Number 365926 · first certified June 1993
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within OH
19 citations — more than 60% of the 922 certified nursing homes in OH. Compared within OH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 8 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: March 2026 to March 2027. This facility’s last Life Safety survey was July 2024. Facilities in OH are typically surveyed 20–32 months after the last one (median 26), measured over 889 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about NORMANDY MANOR OF ROCKY RIVER
One email when it happens. No account; stop it any time with one click.
5 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in OH, and nationally. Surveyors differ markedly between states, so the OH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 19 |
| Median facility in OH | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 25, 2019 | 9 |
| April 15, 2022 | 2 |
| July 11, 2024 | 8 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2024-07-11 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2024-07-11 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 2 | 2024-07-11 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 2 | 2024-07-11 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2024-07-11 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2024-07-11 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2019-04-25 |
| K-0131 | Meet requirements for sections of health care facilities separated by fire resistive construction. | 1 | 2024-07-11 |
What the citations cover
- Smoke Deficiencies 9
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Miscellaneous Deficiencies 3
- Egress Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Miscellaneous Deficiencies | 3 |
| Egress Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 11, 2024 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0131 | Meet requirements for sections of health care facilities separated by fire resistive construction. | Deficient, Provider has date of correction (August 22, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 22, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (August 22, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (August 22, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (August 22, 2024) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (August 22, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 22, 2024) |
April 15, 2022 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (May 15, 2022) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 15, 2022) |
April 25, 2019 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (June 12, 2019) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 12, 2019) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (June 12, 2019) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 12, 2019) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (June 12, 2019) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (June 12, 2019) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (June 12, 2019) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 12, 2019) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (June 12, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.