Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Drumright Nursing Home
Drumright, OK · 133 certified beds · Last Life Safety survey September 22, 2025
CMS Certification Number 375466 · first certified September 2004
Ownership
Operated by OKLAHOMA NURSING HOMES, LTD. · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within OK
10 citations — more than 67% of the 283 certified nursing homes in OK. Compared within OK rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2026 — about 1 month from now. This facility’s last Life Safety survey was September 2025. Facilities in OK are typically surveyed 14–16 months after the last one (median 15), measured over 277 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Drumright Nursing Home
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in OK, and nationally. Surveyors differ markedly between states, so the OK figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 10 |
| Median facility in OK | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 30, 2023 | 5 |
| May 9, 2024 | 4 |
| September 22, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2024-05-09 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 2 | 2024-05-09 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-05-09 |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | 1 | 2024-05-09 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2023-03-30 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2025-09-22 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2023-03-30 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2023-03-30 |
What the citations cover
- Smoke Deficiencies 7
- Miscellaneous Deficiencies 2
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Miscellaneous Deficiencies | 2 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 22, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (December 11, 2025) |
May 9, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 7, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 7, 2024) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (June 7, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 7, 2024) |
March 30, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 31, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (May 31, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (May 31, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 31, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (May 31, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.