Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

FORT GIBSON CARE & REHAB CENTER

FORT GIBSON, OK · 66 certified beds · Last Life Safety survey January 15, 2025

CMS Certification Number 375330 · first certified January 1998

Ownership

Operated by MGM HEALTHCARE · For profit - Limited Liability company

  • Ownership changed May 14, 2024 (change of ownership)from OK4 FT. GIBSON OPCO LLC
9
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
2
Inspection & testing records
Of the citations on file

Position within OK

9 citations — more than 58% of the 283 certified nursing homes in OK. Compared within OK rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 0 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (March 2026 to May 2026), and past the point by which nine in ten OK facilities have been surveyed. This facility’s last Life Safety survey was January 2025. Facilities in OK are typically surveyed 14–16 months after the last one (median 15), measured over 277 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about FORT GIBSON CARE & REHAB CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

1 of the 9 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in OK, and nationally. Surveyors differ markedly between states, so the OK figure is the meaningful one.

This facility9OK median8National median11
Citations on file over three years, compared
MeasureCitations
This facility9
Median facility in OK8
Median facility nationally11

Survey history

Citations at each Life Safety survey
52022-0842023-0902025-01
Citations at each Life Safety survey
Survey dateCitations
August 4, 20225
September 20, 20234
January 15, 20250

Most-cited tags

Most-cited tags at this facility
K-02222K-03471K-03741K-03431K-02911E-00361K-07121K-03621
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.22023-09-20
K-0347Properly provide smoke detection systems in areas open to corridors.12022-08-04
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12023-09-20
K-0343Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire.12023-09-20
K-0291Install emergency lighting that can last at least 1 1/2 hours.12023-09-20
E-0036Establish emergency prep training and testing.12022-08-04
K-0712Have simulated fire drills held at unexpected times.12022-08-04
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.12022-08-04

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 4
  • Egress Deficiencies 3
  • Miscellaneous Deficiencies 1
  • Emergency Preparedness Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies4
Egress Deficiencies3
Miscellaneous Deficiencies1
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

September 20, 2023 — 4 citations

Citations issued on September 20, 2023
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (April 5, 2024)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (April 5, 2024)
K-0343Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire.Deficient, Provider has date of correction (April 5, 2024)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (April 5, 2024)

August 4, 2022 — 5 citations

Citations issued on August 4, 2022
TagWhat the surveyor checksStatus
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (September 1, 2022)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (September 1, 2022)
K-0347Properly provide smoke detection systems in areas open to corridors.Deficient, Provider has date of correction (September 1, 2022)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (September 1, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (September 1, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.