Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Homestead of Hugo
Hugo, OK · 124 certified beds · Last Life Safety survey June 10, 2025
CMS Certification Number 375492 · first certified November 2005
Ownership
Operated by BGM ESTATE · For profit - Corporation
- Ownership changed December 28, 2020 (change of ownership)from CITY OF HUGO
Position within OK
6 citations — more than 35% of the 283 certified nursing homes in OK. Compared within OK rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 1.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: July 2026 to October 2026. This facility’s last Life Safety survey was June 2025. Facilities in OK are typically surveyed 14–16 months after the last one (median 15), measured over 277 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Homestead of Hugo
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in OK, and nationally. Surveyors differ markedly between states, so the OK figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in OK | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 6, 2023 | 1 |
| January 8, 2024 | 2 |
| June 10, 2025 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 2 | 2024-01-08 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2025-06-10 |
| K-0912 | Have power receptacles that are properly grounded. | 1 | 2025-06-10 |
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | 1 | 2024-01-08 |
| K-0344 | Have an alternate power supply for its alarm system. | 1 | 2025-06-10 |
What the citations cover
- Smoke Deficiencies 3
- Services Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Services Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 10, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (July 9, 2025) |
| K-0344 | Have an alternate power supply for its alarm system. | Deficient, Provider has date of correction (July 9, 2025) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (July 9, 2025) |
January 8, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | Deficient, Provider has date of correction (May 20, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (May 20, 2024) |
February 6, 2023 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (March 10, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.