Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
TIMBERLINE POST ACUTE
ALBANY, OR · 67 certified beds · Last Life Safety survey February 13, 2026
CMS Certification Number 385107 · first certified June 1983
Ownership
Operated by PACS GROUP · For profit - Corporation
- Ownership changed September 1, 2024 (change of ownership)from PCI CARE VENTURE I INC.
Position within OR
6 citations — more than 13% of the 128 certified nursing homes in OR. Compared within OR rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens May 2027 — about 8 months from now. This facility’s last Life Safety survey was February 2026. Facilities in OR are typically surveyed 15–17 months after the last one (median 16), measured over 188 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about TIMBERLINE POST ACUTE
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in OR, and nationally. Surveyors differ markedly between states, so the OR figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in OR | 11 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 2, 2023 | 3 |
| September 27, 2024 | 1 |
| February 13, 2026 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2023-06-02 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2023-06-02 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2024-09-27 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2026-02-13 |
| K-0300 | Meet other general requirements that are deficient. | 1 | 2023-06-02 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2026-02-13 |
What the citations cover
- Smoke Deficiencies 4
- Egress Deficiencies 1
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Egress Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 13, 2026 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (March 3, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 3, 2026) |
September 27, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (October 28, 2024) |
June 2, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0300 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 30, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.