Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

ASHLAND POST ACUTE

ASHLAND, OR · 87 certified beds · Last Life Safety survey May 9, 2025

CMS Certification Number 385197 · first certified May 1989

Ownership

Operated by PACS GROUP · For profit - Limited Liability company

  • Ownership changed September 1, 2024 (change of ownership)from CARE CENTER (LINDA VISTA), INC.
9
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
3
Inspection & testing records
Of the citations on file

Position within OR

9 citations — more than 32% of the 128 certified nursing homes in OR. Compared within OR rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Past the typical window (August 2026 to September 2026). Most OR facilities have been surveyed by October 2026. This facility’s last Life Safety survey was May 2025. Facilities in OR are typically surveyed 15–17 months after the last one (median 16), measured over 188 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about ASHLAND POST ACUTE

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

3 of the 9 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in OR, and nationally. Surveyors differ markedly between states, so the OR figure is the meaningful one.

This facility9OR median11National median11
Citations on file over three years, compared
MeasureCitations
This facility9
Median facility in OR11
Median facility nationally11

Survey history

Citations at each Life Safety survey
32022-1012024-0152025-05
Citations at each Life Safety survey
Survey dateCitations
October 7, 20223
January 22, 20241
May 9, 20255

Most-cited tags

Most-cited tags at this facility
K-07612E-00061E-00201K-01631E-00071K-07121K-02231K-03411
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.22025-05-09
E-0006Conduct risk assessment and an All-Hazards approach.12025-05-09
E-0020Establish policies and procedures including evacuation.12025-05-09
K-0163Install noncombustible or limited-combustible interior walls.12022-10-07
E-0007Address patient/client population and determine types of services needed.12025-05-09
K-0712Have simulated fire drills held at unexpected times.12025-05-09
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.12022-10-07
K-0341Install a fire alarm system that can be heard throughout the facility.12024-01-22

What the citations cover

Citations by CMS category
  • Miscellaneous Deficiencies 3
  • Emergency Preparedness Deficiencies 3
  • Egress Deficiencies 1
  • Smoke Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Miscellaneous Deficiencies3
Emergency Preparedness Deficiencies3
Egress Deficiencies1
Smoke Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 9, 2025 — 5 citations

Citations issued on May 9, 2025
TagWhat the surveyor checksStatus
E-0006Conduct risk assessment and an All-Hazards approach.Deficient, Provider has date of correction (June 18, 2025)
E-0007Address patient/client population and determine types of services needed.Deficient, Provider has date of correction (June 18, 2025)
E-0020Establish policies and procedures including evacuation.Deficient, Provider has date of correction (June 18, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (June 18, 2025)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (June 18, 2025)

January 22, 2024 — 1 citation

Citations issued on January 22, 2024
TagWhat the surveyor checksStatus
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (February 9, 2024)

October 7, 2022 — 3 citations

Citations issued on October 7, 2022
TagWhat the surveyor checksStatus
K-0163Install noncombustible or limited-combustible interior walls.Deficient, Provider has date of correction (November 8, 2022)
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (November 8, 2022)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (November 8, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.