Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
HILLSBORO HEALTH AND REHABILITATION
HILLSBORO, OR · 78 certified beds · Last Life Safety survey August 21, 2026
CMS Certification Number 385217 · first certified May 1990
Ownership
Operated by EVERGREEN HEALTHCARE GROUP · For profit - Corporation
- Ownership changed August 31, 2023 (change of ownership)to HILLSBORO HEALTH & REHABILITATION CENTER from EVERGREEN OREGON HEALTHCARE TUALATIN LLC
Position within OR
6 citations — more than 13% of the 128 certified nursing homes in OR. Compared within OR rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys on file averaged 1. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2027 — about 13 months from now. This facility’s last Life Safety survey was August 2026. Facilities in OR are typically surveyed 15–17 months after the last one (median 16), measured over 188 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about HILLSBORO HEALTH AND REHABILITATION
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
How that compares
Compared with the median facility in OR, and nationally. Surveyors differ markedly between states, so the OR figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in OR | 11 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 9, 2024 | 1 |
| May 23, 2025 | 1 |
| August 21, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2026-08-21 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2026-08-21 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2025-05-23 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2024-02-09 |
| K-0100 | Meet other general requirements. | 1 | 2026-08-21 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2026-08-21 |
What the citations cover
- Smoke Deficiencies 2
- Construction Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Miscellaneous Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 2 |
| Construction Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 21, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0100 | Meet other general requirements. | Deficient, Provider has plan of correction (September 25, 2026) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has plan of correction (September 25, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has plan of correction (September 25, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has plan of correction (September 25, 2026) |
May 23, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 25, 2025) |
February 9, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (March 15, 2024) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.