Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
BRIDGEVILLE REHABILITATION & CARE CENTER
BRIDGEVILLE, PA · 194 certified beds · Last Life Safety survey January 22, 2026
CMS Certification Number 395596 · first certified October 1983
Ownership
Operated by GENESIS HEALTHCARE · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within PA
24 citations — more than 89% of the 656 certified nursing homes in PA. Compared within PA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 7.7. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2026 — about 2 months from now. This facility’s last Life Safety survey was January 2026. Facilities in PA are typically surveyed 10–12 months after the last one (median 11), measured over 1,113 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about BRIDGEVILLE REHABILITATION & CARE CENTER
One email when it happens. No account; stop it any time with one click.
5 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
5 of the 24 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
13 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 24 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0908 Keep all essential equipment working safely.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in PA, and nationally. Surveyors differ markedly between states, so the PA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 24 |
| Median facility in PA | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 21, 2023 | 11 |
| August 23, 2024 | 8 |
| August 8, 2025 | 4 |
| January 22, 2026 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2024-08-23 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2024-08-23 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 2 | 2026-01-22 |
| K-0100 | Meet other general requirements. | 2 | 2025-08-08 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2024-08-23 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-08-08 |
| K-0923 | Have proper medical gas storage and administration areas. | 2 | 2025-08-08 |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | 1 | 2024-08-23 |
What the citations cover
- Smoke Deficiencies 9
- Emergency Preparedness Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Construction Deficiencies 2
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Emergency Preparedness Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Construction Deficiencies | 2 |
| Egress Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 22, 2026 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (February 10, 2026) |
August 8, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (September 4, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 4, 2025) |
| K-0915 | Have proper power supply for life support equipment. | Deficient, Provider has date of correction (September 4, 2025) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (September 4, 2025) |
August 23, 2024 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (September 11, 2024) |
July 21, 2023 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (September 19, 2023) |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (September 19, 2023) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (September 19, 2023) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (September 19, 2023) |
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (September 19, 2023) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (October 17, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 17, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 19, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 19, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (September 19, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 19, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.