Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

CAMP HILL SKILLED NURSING AND REHABILITATION CTR

CAMP HILL, PA · 123 certified beds · Last Life Safety survey January 16, 2025

CMS Certification Number 395440 · first certified April 1979

Ownership

Operated by GENESIS HEALTHCARE · For profit - Corporation

  • Ownership changed February 1, 2023 (change of ownership)to CAMP HILL SKILLED NURSING AND REHABILITATION CENTER from MANOR CARE OF CAMP HILL PA LLC
15
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within PA

15 citations — more than 69% of the 656 certified nursing homes in PA. Compared within PA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (November 2025 to January 2026), and past the point by which nine in ten PA facilities have been surveyed. This facility’s last Life Safety survey was January 2025. Facilities in PA are typically surveyed 10–12 months after the last one (median 11), measured over 1,113 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about CAMP HILL SKILLED NURSING AND REHABILITATION CTR

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

7 of the 15 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 15 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in PA, and nationally. Surveyors differ markedly between states, so the PA figure is the meaningful one.

This facility15PA median10National median11
Citations on file over three years, compared
MeasureCitations
This facility15
Median facility in PA10
Median facility nationally11

Survey history

Citations at each Life Safety survey
32023-0282024-0242025-01
Citations at each Life Safety survey
Survey dateCitations
February 16, 20233
February 8, 20248
January 16, 20254

Most-cited tags

Most-cited tags at this facility
K-03212K-03532E-00151E-00071E-00231K-03721E-00371K-01331
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22025-01-16
K-0353Inspect, test, and maintain automatic sprinkler systems.22025-01-16
E-0015Address subsistence needs for staff and patients.12024-02-08
E-0007Address patient/client population and determine types of services needed.12024-02-08
E-0023Establish policies and procedures for medical documentation.12024-02-08
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12025-01-16
E-0037Establish staff and initial training requirements.12024-02-08
K-0133Install a two-hour-resistant firewall separation.12024-02-08

What the citations cover

Citations by CMS category
  • Emergency Preparedness Deficiencies 7
  • Smoke Deficiencies 6
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Construction Deficiencies 1
Citations by CMS category
CategoryCitations
Emergency Preparedness Deficiencies7
Smoke Deficiencies6
Gas, Vacuum, and Electrical Systems Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

January 16, 2025 — 4 citations

Citations issued on January 16, 2025
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (February 10, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (February 10, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (February 10, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (February 10, 2025)

February 8, 2024 — 8 citations

Citations issued on February 8, 2024
TagWhat the surveyor checksStatus
E-0007Address patient/client population and determine types of services needed.Deficient, Provider has date of correction (April 1, 2024)
E-0009Include a process for Emergency Preparedness collaboration.Deficient, Provider has date of correction (April 1, 2024)
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (April 1, 2024)
E-0023Establish policies and procedures for medical documentation.Deficient, Provider has date of correction (April 1, 2024)
E-0025Create arrangements with other facilities to receive patients.Deficient, Provider has date of correction (April 1, 2024)
E-0034Provide a means of sharing information on occupancy/needs.Deficient, Provider has date of correction (April 1, 2024)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (April 1, 2024)
K-0133Install a two-hour-resistant firewall separation.Deficient, Provider has date of correction (April 1, 2024)

February 16, 2023 — 3 citations

Citations issued on February 16, 2023
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (March 16, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (March 16, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (March 16, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.