Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

HAIDA NURSING AND REHAB

HASTINGS, PA · 98 certified beds · Last Life Safety survey December 4, 2025

CMS Certification Number 395592 · first certified June 1983

Ownership

Operated by VALLEY WEST HEALTH · For profit - Limited Liability company

  • New ownershipOwnership changed October 29, 2024 (change of ownership)from GUARDIAN ELDER CARE AT HASTINGS LLC
17
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
5
Tags cited more than once
Across separate surveys
11
Inspection & testing records
Of the citations on file

Position within PA

17 citations — more than 76% of the 656 certified nursing homes in PA. Compared within PA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 1 citation; the earlier surveys in the window averaged 8. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens October 2026 — about 1 month from now. This facility’s last Life Safety survey was December 2025. Facilities in PA are typically surveyed 10–12 months after the last one (median 11), measured over 1,113 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about HAIDA NURSING AND REHAB

One email when it happens. No account; stop it any time with one click.

Which alerts

4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

3 of the 17 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in PA, and nationally. Surveyors differ markedly between states, so the PA figure is the meaningful one.

This facility17PA median10National median11
Citations on file over three years, compared
MeasureCitations
This facility17
Median facility in PA10
Median facility nationally11

Survey history

Citations at each Life Safety survey
82023-1282024-1112025-12
Citations at each Life Safety survey
Survey dateCitations
December 7, 20238
November 7, 20248
December 4, 20251

Most-cited tags

Most-cited tags at this facility
K-03722K-03532K-03632E-00412K-09182K-03211K-03551K-03451
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.22024-11-07
K-0353Inspect, test, and maintain automatic sprinkler systems.22025-12-04
K-0363Install corridor and hallway doors that block smoke.22024-11-07
E-0041Implement emergency and standby power systems.22024-11-07
K-0918Have generator or other power source capable of supplying service within 10 seconds.22024-11-07
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12023-12-07
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12023-12-07
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12024-11-07

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 10
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Emergency Preparedness Deficiencies 3
  • Egress Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies10
Gas, Vacuum, and Electrical Systems Deficiencies3
Emergency Preparedness Deficiencies3
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

December 4, 2025 — 1 citation

Citations issued on December 4, 2025
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (December 17, 2025)

November 7, 2024 — 8 citations

Citations issued on November 7, 2024
TagWhat the surveyor checksStatus
E-0001Establish an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (January 3, 2025)
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (January 3, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (January 3, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 3, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (January 3, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (January 3, 2025)
K-0912Have power receptacles that are properly grounded.Deficient, Provider has date of correction (January 3, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (January 3, 2025)

December 7, 2023 — 8 citations

Citations issued on December 7, 2023
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (January 5, 2024)
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (January 5, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (January 5, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (January 5, 2024)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (January 5, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (January 5, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (January 5, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (January 5, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.