Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

HILLTOP HEIGHTS HEALTH & REHAB CENTER

JOHNSTOWN, PA · 120 certified beds · Last Life Safety survey January 8, 2026

CMS Certification Number 395812 · first certified November 1989

Ownership

Operated by SABER HEALTHCARE GROUP · For profit - Corporation

  • Ownership changed July 1, 2023 (change of ownership)from LAUREL WOOD CARE CENTER, LLC
15
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
7
Inspection & testing records
Of the citations on file

Position within PA

15 citations — more than 69% of the 656 certified nursing homes in PA. Compared within PA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 0 citations; the earlier surveys in the window averaged 7.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens November 2026 — about 2 months from now. This facility’s last Life Safety survey was January 2026. Facilities in PA are typically surveyed 10–12 months after the last one (median 11), measured over 1,113 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about HILLTOP HEIGHTS HEALTH & REHAB CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 15 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 15 Life Safety citations above. The Physical Environment Index

  • F-0908 Keep all essential equipment working safely.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.

How that compares

Citations on file over three years

Compared with the median facility in PA, and nationally. Surveyors differ markedly between states, so the PA figure is the meaningful one.

This facility15PA median10National median11
Citations on file over three years, compared
MeasureCitations
This facility15
Median facility in PA10
Median facility nationally11

Survey history

Citations at each Life Safety survey
132024-0122024-1202026-01
Citations at each Life Safety survey
Survey dateCitations
January 18, 202413
December 12, 20242
January 8, 20260

Most-cited tags

Most-cited tags at this facility
K-09182K-03242K-09121K-09141K-03721E-00411K-09191K-09201
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.22024-12-12
K-0324Provide properly protected cooking facilities.22024-12-12
K-0912Have power receptacles that are properly grounded.12024-01-18
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.12024-01-18
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12024-01-18
E-0041Implement emergency and standby power systems.12024-01-18
K-0919Meet requirements for the use of electrical equipment.12024-01-18
K-0920Ensure proper usage of power strips and extension cords.12024-01-18

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 7
  • Smoke Deficiencies 5
  • Egress Deficiencies 1
  • Miscellaneous Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies7
Smoke Deficiencies5
Egress Deficiencies1
Miscellaneous Deficiencies1
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

December 12, 2024 — 2 citations

Citations issued on December 12, 2024
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (January 13, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (January 13, 2025)

January 18, 2024 — 13 citations

Citations issued on January 18, 2024
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (March 19, 2024)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (February 26, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (February 26, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (February 26, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (March 19, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (February 26, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (February 26, 2024)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (March 19, 2024)
K-0912Have power receptacles that are properly grounded.Deficient, Provider has date of correction (February 26, 2024)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (February 26, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (March 19, 2024)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (February 26, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (February 26, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.